SCH Number 2001071003
Project Info
- Title
- Removal Action at Site 9, Vandenberg Air Force Base, California
- Description
- The proposed removal action at Site 9 includes the installation of a 2,500 ft. horizontal extraction well along the existing surf road for plume containment, an array of 23 vertical groundwater/vapor extraction wells in the potential source area for source remove the main source of the TCE; 3) a carbon treatment system to remove the containments from the extracted groundwater and soil vapor; and 4) a discharge pipeline for the treated groundwater and vapor. The treated vapor will be discharged to the atmosphere and the treated groundwater will be discharged to the existing surface drainage areas and/or below grade by infiltration.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | California Department of Toxic Substances Control (DTSC) | Removal Action at Site 9, Vandenberg Air Force Base, California | |
FIN | California Department of Toxic Substances Control (DTSC) | Removal Action at Site 9, Vandenberg Air Force Base, California | |
NEG | California Department of Toxic Substances Control (DTSC) | Removal Action at Site 9, Vandenberg Air Force Base, California |