SCH Number 2024051202
Project Info
- Title
- U_2023-0008 (Hooper)
- Description
- Major Use Permit for a Major Impact Services and Utilities Facility to include a 20-acre solar farm that spans three parcels utilizing approximately 10,287 solar modules, 32 string inverters, and generating up to a total of 4.0 megawatts (MW) alternating current (AC) [5.6 MW direct current (DC)] equipped with a 4 MW energy storage system interconnecting to PG&E's pre-existing electrical distribution system located on-site.
2 documents in project