SCH Number 2024010798


Project Info

Title
Porterville Irrigation District North Basin Recharge Project
Description
The Project proposes constructing a new turnout in the FKC, excavating an approximately five-acre basin for groundwater recharge, and connecting the FKC to the new basin with a 290-foot long, 36-inch to 48-inch diameter pipeline. The total Area of Potential Effect (APE) is 7.9 acres.