SCH Number 2024010798
Project Info
- Title
- Porterville Irrigation District North Basin Recharge Project
- Description
- The Project proposes constructing a new turnout in the FKC, excavating an approximately five-acre basin for groundwater recharge, and connecting the FKC to the new basin with a 290-foot long, 36-inch to 48-inch diameter pipeline. The total Area of Potential Effect (APE) is 7.9 acres.
2 documents in project