SCH Number 2022050294
Project Info
- Title
- Reservoir 2B Replacement Project
- Description
- The project would include demolition of the existing Reservoir 2B and construction of two new aboveground 0.1-million-gallon reservoirs, each approximately 33 feet in diameter and approximately 24 feet in height. The new reservoirs would be light blue in color, consistent with South Coast Water District's standard tank design. The purpose of the project is to provide additional capacity for South Coast Water District’s 490-pressure zone and contribute to providing an additional 0.1 million gallons of operational, fire, and emergency storage for this zone. The project also includes improvements to the unpaved access road leading to the reservoir site, which would consist of drainage improvements to mitigate stormwater runoff, installation of replacement power supply equipment, and asphalt paving of the road.
3 documents in project