SCH Number 2022030119
Project Info
- Title
- Replacement Well Project
- Description
- The Project consists of the construction and operation of a municipal water well and associated connection to the District's water system. The Project includes the drilling, casing and development of a permanent municipal drinking water supply well. The well will be equipped with a water lubricated pump, electric motor, chlorine disinfection system and a hydropneumatic tank fabricated and installed for pressure control purposes. On-site improvements include fencing, site surfacing and lighting. The well will be furnished with a standby diesel fueled generator to address power service during serving utility outage conditions and constructed on existing District controlled land. A transmission pipeline will be constructed to connect the completed production well to the existing District water distribution system. Other off-site improvements include an access road from the well site to a public road. Site drainage provisions will be tied to the existing adjacent Tulare County storm water basin.
3 documents in project