SCH Number 2021050029
Project Info
- Title
- BRIDGE ROAD OUTFALL FULL CAPTURE SYSTEM AND STORMWATER IMPROVEMENTS AT THE INDUSTRIAL WASTEWATER TREATMENT PLANT
- Description
- The City is proposing two projects to treat stormwater. The first project would be to install a full capture system at the Bridge Road Outfall to treat the stormwater before it reaches the San Benito River. The second project includes improvements at the Industrial Wastewater Treatment Plant and includes a full capture system and a stormwater diversion structure at the Apricot Lane outfall and a stormwater diversion structure at South Street, to replace an existing manhole.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | City of Hollister | Bridge Road Outfall Full Capture System and Storm Water Improvements at the Industrial Wastewater Treatment Plant | |
NOD | City of Hollister | Bridge Road Outfall Full Capture System and Stormwater Improvements at the Industrial Wastewater Treatment Plant | |
MND | City of Hollister | BRIDGE ROAD OUTFALL FULL CAPTURE SYSTEM AND STORMWATER IMPROVEMENTS AT THE INDUSTRIAL WASTEWATER TREATMENT PLANT |