- Title
- Woodlake Sewer Extension Project Addendum
- Description
- As discussed in the original IS/MND, the Project includes the following over three phases: • Removal of approximately 1,250 lineal feet of 8-inch sewer main and manholes. • Installation of approximately 2,220 lineal feet of 8-inch sewer main, 4,200 lineal feet of 10-inch sewer main, 5,800 lineal feet of 15-inch sewer main, and 450 lineal feet of 4-inch force main. • Construction and/or installation of the associated sewer system improvements, including a sewer lift station, manholes, sewer by-pass, pavement trench repair, utility adjustments, existing concrete improvements replacement, and striping modifications. Changes to the Project description include extending the sewer line further south along Blair Road and extending the sewer line south on Mulberry Street, as provided in the Figure in Appendix B, for an additional 5,156 linear feet. Approximately 3,917 of water line will be installed along the same alignment as the additional sewer line.
2 documents in project