SCH Number 2021010113
Project Info
- Title
- LBRID Groundwater Inflow Mitigation Project
- Description
- Replace original vitrified clay and tar-coated steel pipe plus appurtenances delivering raw sewerage to three (3) biological treatment ponds. Install approximately 1,800 feet of 6" perforated drain pipe along top of underlain bedrock profile traversing the northerly pond perimeter for wastewater pond site. Raise berm height on Ponds 1, 2 & 3 in elevation by one (1) foot solely for freeboard purposes and compliance with Regional Water Quality Control Board regulations. Dredge thule clusters in Ponds 1 through 4 per conditions stated in the District's Waste Discharge Requirements.
2 documents in project