SCH Number 2016061006
Project Info
- Title
- Pacoima Wash Bikeway
- Description
- The Pacoima Wash Bikeway would be a 3.25-mile long Class 1 bikeway stretching from the Lopez Earthen Dam and Debris Basin to the existing pedestrian and bicycle bridge at Haddon Ave. The proposed bikeway would include several design features including a 12 ft wide paved bikeway, new bridge crossings over the wash, fencing, increased access points, mileage markers, interpretive signage where appropriate, solar powered lighting, some pedestrian amenities such as seating, trash receptacles, and native landscape plantings. New pedestrian bridges across the channel will be constructed at approximately 8th Street, Telfair Ave and Gladstone Ave (subject to change).
3 documents in project