SCH Number 2015081063
Project Info
- Title
- West Cat Canyon Revitalization Plan Project
- Description
- Note: Extended Per Lead Installation and operation of 233 new thermally enhances oil and gas production wells and 4 new 85 MMBtu/hr steam generators on 91 existing and 11 new pads; 3.5-mile, new 8-inch diameter natural gas pipeline to replace existing 4-inch line; innner field piping, other supporting equipemtn. Treated brine water to be used for steam generators. Oilfield wastewater to be injected into existing water disposal wells onsite. All new facilities to be located within the Cat Canyon Oilfield. Produced oil to transported offsite by truck and/or pipeline.
3 documents in project