SCH Number 2014062003
Project Info
- Title
- Hayford #2 Replacement Project
- Description
- The proposed project involves replacing the existing, elevated Hayford Flume #2 on the Boardman Canal system. The existing 175-foot-long flume would be removed and a new 435-foot-long conveyance pipeline system installed to provide a conveyance for the Boardman Canal flows. The proposed project also includes construction of a new 175-foot-long access road to facilitate access to the work area and provide better access for future maintenance activities. The pipeline will be installed in an engineered bench to traverse the nearby hillside. Hayford Flume #2 would be demolished and removed after the new conveyance system is operational.
2 documents in project