- Title
- Hercules LLC/Prologis Pipeline Removal Project
- Description
- Hercules LLC intends to remove an approximately 2,020-foot-long 8-inch-diameter non-operational, wastewater pipeline that will take about three weeks (one week onshore and two weeks offshore) of construction to remove. The 2,000-foot portion of the pipeline is submerged offshore in San Pablo Bay and a 20-foot portion is located under the shoreline riprap, both portions are under the jurisdiction of the CSLC. The remaining 140-foot onshore portion of the pipeline is under the UPRR and city of Hercules jurisdiction and will be grouted, capped, and left in place.