SCH Number 2013032065
Project Info
- Title
- Runnymede Storm Drain Project Phase II and Repair of the O'Connor Pump Station Outfall Structure Project
- Description
- The Project entails activities to increase storm water conveyance capacity in a drainage ditch originating at the terminus of a storm drain. Project activities include, excavating accumulated sediment and vegetation from the storm water drainage ditch and detention basin, widening the drainage ditch, creating a berm and new pedestrian path with the excavated spoils, installing new culverts under the existing footpath and new footpath, installing a pre-cast concrete outfall structure and repairing the undercutting and associated structural damage to the O'Conner Pump Station outfall structure. CDFW is executing a Lake and Streambed Alteration Agreement, Number 1600-2012-0235-R3, pursuant to Section 1602 of the Fish and Game Code to the project Permittee, City of East Palo Alto.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | City of East Palo Alto | Runnymede Storm Drain Project Phase II and Repair of the O'Connor Pump Station Outfall Structure Project | |
NOD | City of East Palo Alto | Runnymede Storm Drain Project Phase II and Repair of the O'Connor Pump Station Outfall Structure Project | |
MND | City of East Palo Alto | Runnymede Storm Drain Project Phase II and Repair of the O'Connor Pump Station Outfall Structure Project |