SCH Number 2010091043
Project Info
- Title
- Maple Lane Drainage and Sidewalk Improvements
- Description
- The project will re-establish the grade of an eroding roadside ditch by installing sidewalks, drainage pipe and reconstructing an open channel along Maple Lane from the intersection of State Route (SR) 38 southward for a distance of approximately 2,680 feet. Additional improvements include the construction of a 0.5 acre detention basin and the replacement of a 30 inch culvert crossing Maple Lane.
3 documents in project