Title
Recycled Water Distribution Main (Phase 2)
Description
This project involves installation of approximately 10,500 feet of buried 12-inch diameter polyvinyl chloride (PVC) pipe between an existing "T" fitting from the Phase 1 project at the Dutard Road/Black Road intersection and the Rancho Maria Golf Course. The pipeline would extend south on Black Road (approximately 4,200 feet), east along Highway 1 (approximately 4,800 feet), and along the existing entrance road (approximately 1,500 feet) within the Rancho Maria Golf Course to an existing irrigation reservoir.