SCH Number 2008111065
Project Info
- Title
- Sheep Creek Water Company 3MG Welded Steel Water Tank Project
- Description
- The Sheep Creek Water Company is proposing the construction of one new 3MG above-ground welded steel reservoir on a developed project site currently containing 2 existing water tanks and an office building. The project also includes the installation of new on-site piping to connect the new reservoir to the existing water system, on-site reservoir drain/overflow piping, and a new lined retention basin as a permanent evaporation pond for tank overflow.
2 documents in project