SCH Number 2007121020
Project Info
- Title
- Line Q Storm Drain Channel Improvements (CIP D)
- Description
- The project is a rectangular concrete open channel using reinforced concrete box culvert crossings at Evans Road, El Nido Road, and at a junction ~260' east of the Perris Valley Storm Channel. A rip-rap apron will dissipate the flows outletting into the PVSC. The Line Q storm channel will extend for 3,300 linear feet with a general width of 20' and a depth of 8 feet within the RCFCD 52' right-of-way.
2 documents in project