- Schapiro Reservoir Replacement Project
- Description
- Construction of a new 1.0-MG reservoir at the existing reservoir location between Bonita Road and Capital Hill Avenue; installation of a 40-foot diameter temporary tank on the reservoir site during construction of the new reservoir; construction of a new regulator on the Pearl Pumping Plant site on North Arlington Boulevard; construction of a new 320-foot, 16-inch diameter inlet/outlet pipeline between the proposed 1.0-MG tank and the new reservoir valve pit at the Pearl Pumping Plant site; and installation of a seismic isolation valve within the new valve vault at the Pearl Pumping Plant site.