SCH Number 2007082091
Project Info
- Title
- Wet Weather Flow Management Project
- Description
- The proposed project consists of installing two parallel, approximately 700-foot, 60-inch-diameter reinforced concrete under ground storage pipes to temporarily store excess sewage during peak flows or a storm event. The project site is located within a grassy field area known as Burnham Strip, between Highway 1 (Cabrillo Highway) and El Granada, from Coronada Avenue to Capistrano Road. As the peak flows subside, the sewage would drain from the pipes by gravity to the Portola Pump Station wet well. The storage pipes would be installed immediately east of the Montara interceptor pipeline, and would provide approximately 205,000 gallons of storage. An approximately 15-inch-diameter pipeline would connect witht he existing 15-inch Montara Interceptor.
2 documents in project