- Picachio Road Bridge at Cayucos Creek Replacement Project
- Description
- A proposal by San Luis Obispo to replace the existing two-span, timber Picachio Road Bridge over Cayucos Creek with a single span, cast-in-place, voided slab bridge. The existing bridge, construct in 1940, is functionally obsolete. Major components of the project include removing and replacing the existing bridge, constructing and removing a temporary 23-ft-wide gravel-surfaced traffic detour, creek bank stabilization, and restoring creek banks disturbed during construction to preconstruction condition. The bridge footprint would be increased from approximately 756 square feet to approximately 1,705 square feet. The existing supporting structures within the creek would be removed, and foundations for the new bridge would be placed behind the top of the creek banks. The total area of disturbance is estimated to be 1.07 acres.