SCH Number 2003102149
Project Info
- Title
- Wastewater Collection System No. 9
- Description
- SEIR considering realignment of a portion of the original project from Pershing Avenue to Manchester Avenue. The environmental document evaluated the potential environmental effects that would result from approval, construction and operation of the Wastewater Collection System No. 9 (System 9) project with the proposed Manchester Avenue alignment. The purpose of the System 9 project is to provide City wastewater collection service to an approximately 2,900-acre service area in the northeastern portion of the Stockton Metropolitan Area. The service area is composed of Future Growth Areas (FGAs) designated by the Stockton General Plan for planned urban development. The proposed wastewater collection system consists of two pump stations, approximately 1.6 miles of gravity wastewater trunk line and 3.9 miles of wastewater force main. The project is consistent with the City's adopted Wastewater Collection System Master Plan. The proposed project is located generally east of the UPRR tracks, south of Hammer and Foppiano Lanes, west of the Central California Traction RR, and north of Alpine Avenue and the Stockton Diverting Canal.
6 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | City of Stockton | SAa #2004-0023-2 | |
SIR | City of Stockton | Wastewater Collection System No. 9 | |
NOD | City of Stockton | SAa #2004-0023-2 | |
NOD | City of Stockton | City of Stockton - Wastewater System #9 Project | |
EIR | City of Stockton | SAa #2004-0023-2 | |
NOP | City of Stockton | SAa #2004-0023-2 |