SCH Number 2002091106
Project Info
- Title
- Pasadena City College Master Plan 2010
- Description
- Remove the existing Music Building (K Building) and the existing Technology Building (T Building). Construct a new Combined Arts Building and a new Industrial Technology Arts Building. Construct a new 4.5 floor parking structure, with the half level below grade, on Bonnie Avenue, about midway between Colorado and Del Mar Boulevards. Add a multi-purpose physical education field alongside the parking structure at Bonnie and Del Mar. Replace the existing Campus Connection Center with a new facility to house the Campus Cafe, security office, Associated Student offices, student copy center and coffee bar, a bookstore, and Student Business Office. Renovate spaces on the first floor of the E Building; the first, third and fifth floors of the R Building, the Boiler House; the V Building; the W Building; and the Z Building. Renovate and upgrade utilities systems and services. Create an East Campus Gateway at the east edge of the campus that will simultaneously improve circulation along Bonnie Avenue, create a student drop-off area, and provide a temporary bus parking area for the athletic teams adjacent to the proposed practice field, the stadium, and to the proposed Arts building. Create a Waste Campus Gateway to improve the operational efficiency of the Hill Avenue/Green Street intersection, provide a student drop-off facility adjacent to the proposed new Campus Center entrance, and Quad connection. Also provide enhanced landscaping, signage and hardscapes.
3 documents in project