SCH Number 2001098219


Project Info

Title
Streambed Alteration Agreement to Perform Maintenance Work (Dredging and Vegetation Removal) at a Storm Drain Outlet at Chapparosa Park
Description
Alter the streambed to perform maintenance work at the opening of the 72-inch storm drain outlet just upstream from the baseball field at Chapparosa Park, to remove sediments and aquatic vegetation. This maintenance work will include the dredging of unvegetated sediments within and directly adjacent to the storm drain outlet, and the removal of cattails, not to exceed an area 10 feet wide by 100 feet long, which blocks the flow of water near the outlet.
Download CSV New Search

 

1 documents in project

Type Lead/Public Agency Received Title
Fish & Game #5 SAA # R5-2001-0139