SCH Number 1992021075


Project Info

Title
Wilmington Parkway Subsequent EIR
Description
The layout or plan view of the proposed Wilmington Parkway is shown (Figure 2). Harry Bridges Boulevard and the adjoining rail tracks would be moved or realigned between Figueroa Street and Island Avenue as they were proposed under the previously evaluated project, except that the right-of-way would be shifted approximately 50 feet to the south. The Harry Bridges roadway improvements in the existing right-of-way are the same as those for the previously approved project from Island Avenue to where it intersects with Alameda Street. The right-of-way width for realignment of Harry Bridges Boulevard and railway along with improvements to "C" Street and the Wilmington Parkway between the realigned Harry Bridges/Boulevard and "C" Street is approximately 215 feet wide.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Los Angeles Harbor Department Wilmington Parkway Subsequent EIR
Los Angeles Harbor Department B Street Realignment
Los Angeles Harbor Department B Street Realignment