Wilshire Boulevard Improvements - Crescent Drive Intersection and Spot Repairs Project
Summary
SCH Number
2024071089
Public Agency
City of Beverly Hills
Document Title
Wilshire Boulevard Improvements - Crescent Drive Intersection and Spot Repairs Project
Document Type
NOE - Notice of Exemption
Received
Posted
7/29/2024
Document Description
The work at Wilshire Blvd and Crescent Dr includes: new crosswalk with upgraded traffic signals, extended sidewalk, ADA-compliant curb ramps, pavement reconstruction, and new streetscape features (benches with planters, pedestrian lighting, canopy tree, and patterned sidewalk). This improvement aims to enhance safety, accessibility, and aesthetics for pedestrians and motorists. In addition, the project includes spot repairs along Wilshire Blvd between Peck Drive and Rexford Drive: damaged curb and gutter replacements, bus pad repairs and installations, pavement spot repairs, and catch basin deck replacements.
Contact Information
Name
Christine Chung
Agency Name
City of Beverly Hills
Job Title
Project Manager
Contact Types
Lead/Public Agency / Project Applicant
Phone
Email
Location
Cities
Beverly Hills
Counties
Los Angeles
Regions
Citywide
Zip
90210
Other Location Info
Wilshire Blvd between Peck Drive and Rexford Drive, and Wilshire Blvd and Crescent Drive Intersection
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Class 15301 Existing Facilities; (c)
Reasons for Exemption
The project will perform improvements and maintenance of existing streets, including the addition of a crosswalk, normalizing the intersection geometry with extension of sidewalk, replacement of curb ramps to current standards, curb and gutter repairs, pavement spot repairs, and bus pad repairs and installations. These changes will not significantly alter the use of the streets or create additional automobile lanes.
County Clerk
Los Angeles