28th Street Storm Drain Infiltration Project

3 Documents in Project

Summary

SCH Number
2024020618
Lead Agency
City of Manhattan Beach
Document Title
28th Street Storm Drain Infiltration Project
Document Type
NOD - Notice of Determination
Received
Posted
7/31/2024
Document Description
The City is proposing to construct the 28th Street Storm Drain Infiltration Project. Runoff will be diverted from the existing County-owned storm drain located below 28th Street through a pipe aligned southeast on Manhattan Avenue. The diverted runoff will be pumped to a trash removal device and sedimentation system (pretreatment) to remove trash and sediment and then distributed to a matrix of drywells located in and around the 26th Street parking facility. The Project will reconstruct the driving/parking surface with pervious pavement and install drought-tolerant landscaping.

Contact Information

Name
Melanie Choy
Agency Name
California Natural Resources Agency
Job Title
Grant Administrator
Contact Types
Responsible Agency

Location

Cities
Manhattan Beach
Counties
Los Angeles
Regions
Southern California
Cross Streets
26th Street and Manhattan Avenue
Zip
90266

Notice of Determination

Approving Agency
California Natural Resources Agency
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
California Natural Resources Agency, 715 P Street, 20th Floor, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search Print