Firestone Solar Phase II
Summary
SCH Number
2023040553
Lead Agency
City of Paso Robles
Document Title
Firestone Solar Phase II
Document Type
MND - Mitigated Negative Declaration
Received
Document Description
The project consists of a solar system facility to be installed in the rear of the Firestone campus. The system includes a 1.2 megawatt (MW) ground-mounted single axis tracker system on approximately 4.84-acres of a 13.75-acre field located southeast of Firestone’s main building operations, adjacent to the existing solar system. The tracker system will be interconnected to the electric utility infrastructure via a line side tap at an existing service located between the water treatment ponds and the railroad tracks.
Contact Information
Name
Darcy Delgado
Agency Name
City of Paso Robles
Job Title
Associate Planner
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Paso Robles
Counties
San Luis Obispo
Regions
Citywide
Cross Streets
Ramada Drive
Zip
93446
Total Acres
4.84
Parcel #
009-631-018
State Highways
Hwy 101
Railways
Union Pacific
Waterways
Salinas River
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 5 (DOT), California Department of Water Resources (DWR), California Energy Commission, California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Coast Region 3 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, State Water Resources Control Board, Division of Water Quality, California Department of Fish and Wildlife, Central Region 4 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, Central Region 4 (CDFW)
Development Types
Power:Solar (Megawatts 1.2)
Local Actions
Master Plan, Use Permit
Project Issues
Biological Resources, Cultural Resources, Tribal Cultural Resources