SFPP Bradshaw Terminal Renewable Diesel and Bio by Rail Project
Summary
SCH Number
2022060198
Lead Agency
City of Rancho Cordova
Document Title
SFPP Bradshaw Terminal Renewable Diesel and Bio by Rail Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Office Industrial Mixed Use and Transportation Corridor/Folsom Blvd Specific Plan
Document Description
SFPP, L.P. (SFPP), a subsidiary of Kinder Morgan, proposes to expand its Bradshaw Terminal to allow for renewable diesel (RD) and biodiesel operations. The SFPP Bradshaw Terminal Renewable By Rail Project (project) would include new rail infrastructure at Bradshaw Terminal and within the existing Sacramento Regional Transit (SacRT) and Union Pacific Railroad (UPRR) rail corridor. Within the existing rail corridor, a new rail runaround would be installed to spot approximately 22 railcars on SacRT right-of-way for railcar delivery purposes.
Within the Bradshaw Terminal, the project would have approximately 22 railcar storage/offload locations with rail spots dedicated for biodiesel and RD offloading. The rail system would be able to offload approximately 20,000 barrels per day (bpd) of total product to include 1,240 bpd of biodiesel. The Bradshaw Terminal would normally receive one (1) rail delivery per day, up to 5 days per week (M-F).
The project would also include a new 80,000-barrel (bbl) RD storage tank and a new insulated biodiesel tank with approximately 15,000-bbl working capacity. Both tanks would be installed within the existing secondary containment area; however, the containment area would be modified slightly for the new volumes.
Additionally, the project would include a new two-lane truck blending and loading rack. The truck rack would be capable of blending biodiesel with CARB diesel or RD. Truck loading may to take place up to 7 days per week. The project’s proposed fuel throughput would result in 112 new truck loads per day, for 224 new truck trips per day.
Contact Information
Name
Darcy Goulart
Agency Name
City of Rancho Cordova
Job Title
Planning Manager
Contact Types
Lead/Public Agency
Phone
Name
Rolland Curry
Agency Name
SFPP Kinder Morgan
Job Title
VP
Contact Types
Project Applicant
Phone
Name
Chryss Meier
Agency Name
GHD
Job Title
Environmental Consultant
Contact Types
Consulting Firm
Phone
Email
Location
Cities
Rancho Cordova
Counties
Sacramento
Regions
Citywide, Countywide, Statewide
Cross Streets
Southeast corner of Folsom and Bradshaw Rd and South of SacRT line at Folsom Blvd. between Routi
Zip
95670
Total Acres
27.6
Parcel #
068-0160-099 & 100, 068-0160-001, 077-0010-2001 & 020
State Highways
50
Railways
Sac RT and UPRR
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 3 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California State Lands Commission (SLC), Central Valley Flood Protection Board, Delta Protection Commission, Delta Stewardship Council, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality, California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
State Reviewing Agency Comments
California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
Development Types
Industrial (Sq. Ft. 95000, Acres 27.6, Employees 20)
Local Actions
Site Plan, Use Permit
Project Issues
Biological Resources, Cultural Resources, Hazards & Hazardous Materials, Mandatory Findings of Significance, Tribal Cultural Resources
Public Review Period Start
Public Review Period End