Augusta Way Apartments
2 Documents in Project
Summary
SCH Number
2022040413
Lead Agency
Sacramento County
Document Title
Augusta Way Apartments
Document Type
NOD - Notice of Determination
Received
Posted
1/20/2023
Document Description
The project consists of the following planning entitlement requests:
• A Special Development Permit to allow the proposed project to deviate from the following development standards:
o Landscape Screening (Section 5.2.4.B.2.a.i): Landscape planters eight feet in width are required between the parking lot and public right-of-way (ROW). As proposed, the landscape planter between the parking lot and ROW measures a minimum of six feet.
o Trash Enclosure Landscaping (Section 5.2.4.B): Trash enclosures are required to have five feet of landscaping surrounding three sides of the enclosure. As proposed, the trash enclosure will have five feet of landscaping on two sides.
o Tree Spacing Along ROW Frontage (Section 5.2.4.B.2.a): Trees are required to be planted a maximum of 30 feet on center in the planter along the ROW. As proposed, the trees would be planted a maximum of 40 feet on center.
o Carport Material (Section 5.9.4.E.2): Metal carports are not permitted per this section. Metal carports are proposed.
• A Design Review to determine substantial compliance with the Sacramento County Countywide Design Guidelines (Design Guidelines).
Contact Information
Name
Joelle Inman
Agency Name
Sacramento County Planning
Job Title
ENVIRONMENTAL COORDINATOR
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Sacramento
Counties
Sacramento
Regions
Countywide
Parcel #
043-0081-003-0000
Notice of Determination
Approving Agency
Sacramento County Planning
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
https://planningdocuments.saccounty.net/
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No