Avalon K-12 HVAC, ADA, Contaminated Soil Removal and New Synthetic Turf Field Project
2 Documents in Project
Summary
SCH Number
2020070229
Lead Agency
Long Beach Unified School District
Document Title
Avalon K-12 HVAC, ADA, Contaminated Soil Removal and New Synthetic Turf Field Project
Document Type
NOD - Notice of Determination
Received
Posted
10/13/2020
Present Land Use
Public (K-12 school)
Document Description
The purpose of the Avalon K-12 School HVAC, ADA, Contaminated Soil Removal, and New Synthetic Turf Field project (“Proposed Project”) is to provide: HVAC to permanent buildings, interior improvements to buildings on the campus, and ADA improvements. Additionally, the Proposed Project will replace the existing natural turf athletic field with a new synthetic turf field; the Proposed Project will also remove delineated contaminated soil and any additional contaminated soil encountered that is located on the campus.
Contact Information
Name
Elston Soares
Agency Name
Long Beach Unified School District
Contact Types
Lead/Public Agency
Phone
Email
Name
Agency Name
Long Beach Unified School District
Contact Types
Project Applicant
Location
Cities
Avalon
Counties
Los Angeles
Cross Streets
200 Falls Canyon Road
Zip
90704
Total Acres
11.5
Parcel #
7480-002-907
Schools
Avalon K-12
Waterways
Avalon Bay
Notice of Determination
Approving Agency
Long Beach Unified School District Board of Education
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes