PLER2024-00038 Rio Linda (RIO-3) High-Flow Diversion
4 Documents in Project
Summary
SCH Number
2020029084
Lead Agency
Sacramento Area Sewer District
(SASD)
Document Title
PLER2024-00038 Rio Linda (RIO-3) High-Flow Diversion
Document Type
NOD - Notice of Determination
Received
Posted
7/29/2024
Document Description
Sacramento Area Sewer District (SacSewer) proposes to add the Rio Linda (RIO-3) High-Flow Diversion (RIO-3 Relief Project) to the previously approved Linda Manor Septic to Sewer Conversion Project (Septic to Sewer Project). The RIO-3 Relief Project includes the installation of an 8-inch, 63-foot-long overflow pipe connecting the existing RIO-3 sewer system to the proposed Linda Manor sewer system along W 2nd Street at the intersection with Elkhorn Boulevard. The pipe would be installed at the north end of the intersection extending 63 feet south along W 2nd Street The addition of the overflow pipe would alleviate capacity constraints in the Rio Linda sewer system by diverting flows to the proposed Linda Manor sewer system. Additionally, the integration of the diversion pipe is anticipated to improve hydraulics in the Rio Linda sewer system and reduce the risk of sewer spills.
The RIO-3 Relief Project would be constructed at the same time as the Septic to Sewer Project minimizing impacts to the adjacent communities by removing the need for repetitive work in the intersection, decreasing the amount of traffic control, excavation, and pavement restoration. The RIO-3 Relief Project is within the boundaries of the previously analyzed Septic to Sewer Project.
Contact Information
Name
Anne Tran
Agency Name
Sacramento Area Sewer District
Job Title
Assoc Civil Engineer
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Sacramento
Counties
Sacramento
Regions
Countywide
Parcel #
N/A – within the public roadway
Notice of Determination
Approving Agency
Sacramento Area Sewer District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
https://planningdocuments.saccounty.net/
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum to a previously adopted Mitigated Negative Declaration)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No