Weissman (Dipsea Ranch) Land Division
4 Documents in Project
Summary
SCH Number
2019129035
Lead Agency
Marin County
Document Title
Weissman (Dipsea Ranch) Land Division
Document Type
NOD - Notice of Determination
Received
Posted
9/1/2022
Document Description
The applicant is requesting approval to subdivide an existing 8.29-acre lot into 3 single-family residential lots. Residential development currently exists at the property and access to the site is proposed to be provided via the existing entry driveway at 455 Panoramic Highway. The project includes a proposal to install two new on-site sewage disposal systems to serve Lots 2 and 3. Water service would be provided by the Marin Municipal Water District (MMWD). The project also includes the incorporation of a storm water management plan that utilizes a system of storm drains, cisterns, and bioswales to address runoff.
Contact Information
Name
Tammy Taylor
Agency Name
Marin County CDA
Job Title
Senior Planner
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Mill Valley
Counties
Marin
Regions
Unincorporated
Cross Streets
Panoramic Highway and Kent Way
Zip
94941
Total Acres
8.29
Parcel #
046-161-11
State Highways
Panoramic Highway
Notice of Determination
Approving Agency
County of Marin
Approving Agency Role
Lead Agency
Approved On
County Clerk
Marin
Final Environmental Document Available at
Website: https://www.marincounty.org/depts/cd/divisions/environmental-review
Address: 3501 Civic Center Drive, Room 308, San Rafael, CA 94903
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Amendment to the 2020 Mitigated Negative Declaration)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes