Refer to SCH #2019099095; Elder Creek Flood Control Channel Improvements
4 Documents in Project
Summary
SCH Number
2019059033
Lead Agency
San Bernardino County
Document Title
Refer to SCH #2019099095; Elder Creek Flood Control Channel Improvements
Document Type
NOD - Notice of Determination
Received
Posted
5/12/2020
Document Description
Note: Please use the correct SCH number 2019099095 at the link: https://ceqanet.opr.ca.gov/2019099095/3. See memo for further details.
The proposed Project Involves the construction and maintenance of approximately 2,100 linear feet of Improvements to Elder Creek Channel, between Old Greenspot Rd. to approximately 700 feet downstream of Abbey Way in the City of Highland. The project will provide enhanced flood protection to surrounding residents and businesses. Improvements includes widening and deepening the existing concrete channel, constructing a new 26 foot wide by 10-feet deep concrete channel, road culvert upgrades, placement of rock at specific locations, grading, and enhancing and setting aside the existing earthen channel downstream of Abbey for wetland-riparian wildlife purposes. Routine maintenance will include activities such as vegetation management, sediment removal, and maintenance of excess roads and appurtenant structures.
Contact Information
Name
Michele Derry
Agency Name
San Bernardino Countv
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
San Bernardino County
Contact Types
Project Applicant
Location
Cities
Highland
Counties
San Bernardino
Notice of Determination
Approving Agency
San Bernardino County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes