Water Energy Efficiency Project
Summary
SCH Number
2019018436
Public Agency
City of San Luis Obispo
Document Title
Water Energy Efficiency Project
Document Type
NOE - Notice of Exemption
Received
Posted
1/24/2019
Document Description
The Water Efficiency project proposes improvement to the City's Water Treatment Plant located on Stenner Creek Road. This includes installation of a hydrogenation facility on the existing 12-inch Nacimiento water pipeline, installation of back-up generator at the transfer pump station, upgrade to the existing ozone system, installation of ground-mounted and canopy-mounted photovoltaic arrays, indoor and exterior lighting, various HVAC improvements, upgrades to the plant service water system, filter backwash tank filling improvements, and SCADA system and controls upgrades. The project also includes installation of equipment (variable frequency drives and altitude valve) at the City's existing Ferrini Pump Station and at Whale Rock Reservoir.
Contact Information
Name
Jennifer Metz
Agency Name
City of San Luis Obispo
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Luis Obispo
Other Location Info
City: Unincorporated
Location Specific: Three sites: Water Treatment Plant, Ferrini Pump Station, Whale Rock Reservoir
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Class 1, 28, Sec. 15301, 15328
Reasons for Exemption
The proposed Water Energy efficiency project is located at the City's Water Treatment Plant located on Stenner Creek Road approximately ¾ of a mile north of Highway 1, at Ferrini Pump Station located south of the intersection of Stenner Creek Road and Highway 1, and at Whale Rock Reservoir.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.