Operation of Golden State Water Company - Cypress Ridge (Company) - New Interconnection to Nipomo Community Services District Project

2 Documents in Project

Summary

SCH Number
2018071025
Lead Agency
State Water Resources Control Board
Document Title
Operation of Golden State Water Company - Cypress Ridge (Company) - New Interconnection to Nipomo Community Services District Project
Document Type
NOD - Notice of Determination
Received
Posted
9/5/2018
Present Land Use
residential
Document Description
The project includes installation of a new water pipeline within the existing county of San Luis Obispo ROW to provide supply redundancy to existing customers. The new pipeline will connect to the existing Nipomo CSD distribution system and terminate at GSWC's El Campo Reservoirs, where high nitrate well water will be blended down into the Cypress Ridge Water System to provide supply redundancy to existing GSWC customers. Approx 10,400 ft of 8-in transmission pipeline would be installed within the county ROW using an open trench method. The trench would be approx 3 ft wide by 5 ft, running approx 2 mi from 650 West El Campo Rd to 1789 Lyn Rd in unincorporated San Luis Obispo County near the community of Nipomo.

Contact Information

Name
Jeff Densmore
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Nipomo
Counties
San Luis Obispo
Cross Streets
650 West El Campo Rd to 1650 West El Campo Rd
Zip
93420
Township
12N
Range
35W
Section
32,33
Base
SB

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print