Sweetwater Dam and South Dike Improvements Project
5 Documents in Project
Summary
SCH Number
2017111066
Lead Agency
Sweetwater Authority
Document Title
Sweetwater Dam and South Dike Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
1/26/2018
Present Land Use
S80 - Special purpose
Document Description
The proposed project includes improvements to the Sweetwater Dam and South Dike to safely pass and contain storm water flows associated with a Probable Max Flood event. In order to achieve that primary objective, an existing parapet wall on the north side of the dam would be raised and a new parapet wall would be constructed on the south side. Additionally, the South Dike would be raised. Other minor repairs and modifications to the Sweetwater Dam, South Spillway, and associated facilities would also be conducted. The proposed project would fully comply with the DWR Division of Safety of Dams regulatory program (California Water Code Division 3, Dams and Reservoirs).
Contact Information
Name
Erick Del Bosque
Agency Name
Sweetwater Authority
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Diego
Cross Streets
Sweetwater Dam
Zip
91902
Total Acres
15.18
Parcel #
5851610100, 5851001500
State Highways
54, 125
Schools
La Presa, Audubon ES
Waterways
Sweetwater Reservoir, Sweetwater River
Other Location Info
Spring Valley
Notice of Determination
Approving Agency
Sweetwater Authority
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.