Phase 1 - Distribution System (Project)
2 Documents in Project
Summary
SCH Number
2016088392
Public Agency
Tulare County
Document Title
Phase 1 - Distribution System (Project)
Document Type
NOE - Notice of Exemption
Received
Posted
6/22/2018
Document Description
SWRCB is a responsible agency for this project. The SWRCB's Safe Drinking Water State Revolving Fund (SDWSRF) Program is providing state funds for the project. The Tulare county Resource Management Agency proposes the replacement of the drinking water distribution system within the community of Seville. Approx. 14,540 feet of 8 inch distribution pipeline will be installed within the community of Seville, along with water meters, gate valves, and fire hydrants. A 211,000 gallon storage tank and a new Supervisory Control and Data Acquisition system are also included in the project, however construction of these elements is contingent on available funding.
Contact Information
Name
Reed Schenke
Agency Name
Tulare County Resource Management Agency
Contact Types
Lead/Public Agency
Phone
Location
Counties
Tulare
Other Location Info
Community of Tettem and Seville
Notice of Exemption
Exempt Status
Declared Emergency
Type, Section or Code
S:15269 (a) or (b)
Reasons for Exemption
Project has been determined an emergency project necessary to prevent or mitigate loss of or damage to life, health, property or essential public services by the Tulare County Resource Management Agency.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.