Barry School Water Line Extension Project

3 Documents in Project

Summary

SCH Number
2016062026
Lead Agency
Yuba City
Document Title
Barry School Water Line Extension Project
Document Type
NOD - Notice of Determination
Received
Posted
3/5/2018
Present Land Use
located within county road rights of way
Document Description
The proposed project involves constructing a 3-inch diameter water line approximately 1.22 miles long, along Railroad Ave and Barry Road. The water service line would begin from the intersection of Railroad Ave and Stewart Rd, where it would connect to two proposed water mains, 14-inches and 12-inches in diameter. The proposed 14-inch water main will run south on Railroad Ave from Tuscan Rd for approximately 0.57 miles. The 12-inch water main will run west for 0.56 miles from the Yuba City limits located near Riverbend Elementary School. The proposed project would result in approximately 2.35 miles of additional water service pipeline.

Contact Information

Name
Manu Dhaliwal
Agency Name
Yuba City
Contact Types
Lead/Public Agency

Location

Cities
Yuba City
Counties
Sutter
Cross Streets
Barry Rd, Railroad Ave and Stewart Rd
Zip
95993
Total Acres
1.2
State Highways
99
Railways
Southern Pacific RR
Airports
Sutter County Airport
Waterways
Feather River
Township
14N
Range
3E
Section
3, 10
Base
MDBM

Notice of Determination

Approving Agency
City of Yuba City
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print