Talbot Water Diversions and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0703-R1)

778 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Talbot Water Diversions and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0703-R1)
Document Type
NOD - Notice of Determination
Received
Posted
3/11/2021
Document Description
The project to be completed is located within the Van Duzen River watershed, approximately 3 miles NW of the town of Mad River, County of Humboldt, State of California. The project is located in Section 12, T01N, R05E, Humboldt Base and Meridian; in the Dinsmore U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Number 208-331-006; latitude 40.4763 N and longitude -123.5519 W at the first point of diversion.

Contact Information

Name
Cheri Sanville
Agency Name
California Department of Fish & Wildlife
Contact Types
Responsible Agency

Location

Cities
Mad River
Counties
Humboldt
Regions
Northern California
Parcel #
208-331-006
State Highways
36
Other Location Info
The project to be completed is located within the Van Duzen River watershed, approximately 3 miles NW of the town of Mad River, County of Humboldt, State of California. The project is located in Section 12, T01N, R05E, Humboldt Base and Meridian; in the Dinsmore U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Number 208-331-006; latitude 40.4763 N and longitude -123.5519 W at the first point of diversion.

Notice of Determination

Approving Agency
Cheri Sanville
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Humboldt
Final Environmental Document Available at
Humboldt County Dept. of Planning and Building 3015 H Street Eureka, CA 95501 Contact: Steven Lazar Phone: 707-445-7245

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search Print