Alpaugh Water System Arsenic Treatment Project
3 Documents in Project
Summary
SCH Number
2015081078
Lead Agency
Alpaugh Irrigation District
Document Title
Alpaugh Water System Arsenic Treatment Project
Document Type
NOD - Notice of Determination
Received
Posted
11/17/2015
Present Land Use
Water Well Site/Rural Residential/Residential
Document Description
The District is proposing to upgrade the potable water system facilities at its Well No. 1 site located at 5320 McNeely Road, Alpaugh, CA 93201. The upgrades are proposed to include the addition of an arsenic treatment system and associated piping, replacement of the existing stand-by generator, installation of an on site wastewater disposal system (septic tank and leach field), construction of a 1500 SF metal building (to house an office, laboratory, and chemical storage), and the installation of solar arrays to provide electrical power for District uses.
Contact Information
Name
John Burchard
Agency Name
Alpaugh Community Service District
Contact Types
Lead/Public Agency
Address
Phone
Location
Coordinates
Counties
Tulare
Cross Streets
McNeely Road and Center Street (Ave 54)
Zip
93201
Total Acres
5
Parcel #
311-012-23
State Highways
No
Railways
West Isle Line
Airports
No
Schools
Alpaugh Unified
Waterways
Homeland Canal
Township
23S
Range
23E
Section
34
Base
MDB&M
Other Location Info
Alpaugh
Notice of Determination
Approving Agency
Alpaugh CSD
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.