Groundwater Monitoring Wells for CD IV Geothermal Project
Summary
SCH Number
2014128358
Public Agency
Mono County
Document Title
Groundwater Monitoring Wells for CD IV Geothermal Project
Document Type
NOE - Notice of Exemption
Received
Posted
12/29/2014
Document Description
The project includes construction of two groundwater monitoring wellls to address concerns of the proposed CD IV project's well field production on cold groundwater that supplies water for the Town of Mammoth Lakes. One well will be located on existing geothermal well pad 14-25 (single piezometer) and the other well will be at the USFS "junk yard" east of the Mammoth Lakes Welcome Center (visitor center) on US Highway 395. The lands are managed by the Inyo National Forest with geothermal leases managed by the Bishop BLM Field Office.
Contact Information
Name
Louis Molina
Agency Name
Mono County
Contact Types
Lead/Public Agency
Phone
Location
Cities
Mammoth Lakes
Counties
Mono
Notice of Exemption
Exempt Status
Ministerial
Type, Section or Code
21080(b)(1); 15268
Reasons for Exemption
The project is ministerial and complies with Chapter 7.36 Wells of the Mono County Code.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.