Cypress Ridge LP Tract Map and Conditional Use Permit (TR 2993)
2 Documents in Project
Summary
SCH Number
2013111012
Lead Agency
San Luis Obispo County
Document Title
Cypress Ridge LP Tract Map and Conditional Use Permit (TR 2993)
Document Type
NOD - Notice of Determination
Received
Posted
4/29/2014
Present Land Use
Residential Rural
Document Description
Request by Cypress Ridge L.P. for a Vesting Tentative Tract map (TR 2993) and CUP to allow a cluster subdivision of two existing 20.78 and 40.02 acre parcels resulting in twenty-one parcels of one acre each for the purpose of sale and/or development and two open space parcels of 21.2 and 14.6 acres. The applicant has applied for a Transfer of Development Credit (TDC) to transfer nine residential credits to the property. The project will result in the disturbance of approximately 40 acres of 61-acre site as a result of the access drive, access trails, and future residences on the proposed parcels. The proposed project is within the Residential Rural land use category and is located at 852 Zenon Way; approximately 2400 feet northeast of Callender Rd, directly east of the community of Palo Mesa.
Contact Information
Name
Brian Pedrotti
Agency Name
San Luis Obispo County
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Nipomo
Counties
San Luis Obispo
Cross Streets
Zenon Way and Cypress Ridge Parkway
Zip
93444
Total Acres
60
Parcel #
075-351-022, -028
State Highways
Hwy 101
Notice of Determination
Approving Agency
San Luis Obispo County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.