Nutmeg Investments Minor Use Permit DRC 2006-00234
2 Documents in Project
Summary
SCH Number
2011051071
Lead Agency
San Luis Obispo County
Document Title
Nutmeg Investments Minor Use Permit DRC 2006-00234
Document Type
NOD - Notice of Determination
Received
Posted
7/21/2011
Present Land Use
Residential Multi-Family; Local Coastal Plan Archeologically Senstive
Document Description
Request by Nutmeg Investments Partnership for a Minor Use Permit / Coastal Development Permit to allow redevelopment of the subject property in two phases. The first phase includes demolition of three existing detached single family residences and redevelopment of the site into (2) 4-unit apartments (4-attached one bedroom units), totaling 8 units. The second phase includes (1) 4-unit apartment (4-attached one bedroom units) and (1) 3-unit apartment (3 attached one bedroom units), totaling 7 units. Phase II will not occur until a community-wide wastewater system is available. The project will result in 15 total units for both phases. Each unit is approximately 892 sq. ft. in size, two-story and includes a single car garage. The project will result in the disturbance of approximately 35,000 sq. ft. on a 1.04 acre parcel. The proposed project is within the Residential Multi-family land use category and is located at 1990 Mountain View Drive in of community of Los Osos. The site is in the Estero planning area.
Contact Information
Name
Kerry Brown
Agency Name
San Luis Obispo County
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Luis Obispo
Cross Streets
South Bay
Total Acres
1
Parcel #
074-263-039
Other Location Info
City/Nearest Community: Los Osos
Notice of Determination
Approving Agency
San Luis Obispo County Department of Planning and Building
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.