Yuba City Feather River Fish Screen Work Period Amendment Project

8 Documents in Project

Summary

SCH Number
2009112013
Lead Agency
Yuba City
Document Title
Yuba City Feather River Fish Screen Work Period Amendment Project
Document Type
NOD - Notice of Determination
Received
Posted
1/9/2014
Document Description
To install a 24-inch by 23.3 inch reinforced concrete ductbank, that will house low voltage electrical and fiber wire, up-and-over the right (west) bank levee of the Feather River and to install associated conduit, manholes, and pullboxes on the right (west) bank overflow area of the feather River that will carry electrical and fiber control wires from the right (west) bank west supply low lift pump station to the Yuba City Water Treatment Plan located at 701 Northgate Drive.

Contact Information

Name
James Herota
Agency Name
Central Valley Flood Protection Bd.
Contact Types
Lead/Public Agency

Location

Cities
Yuba City
Counties
Sutter
Cross Streets
Summer St, Hwy 20, 10 th St Bridge
Zip
95993
Total Acres
1.53
Parcel #
51-580-003
State Highways
99, 20
Airports
Sutter County
Schools
Albert Powell HS
Waterways
Feather River
Township
15N
Range
3E
Section
11

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print