Drilling and Equipping Wells 30 and 31

6 Documents in Project

Summary

SCH Number
2007101102
Lead Agency
City of Colton
Document Title
Drilling and Equipping Wells 30 and 31
Document Type
NOD - Notice of Determination
Received
Posted
7/2/2009
Document Description
Colton's Drilling and Equipping Wells 30 and 31 Project consists of constructing, equipping, and operating 2 domestic water production wells in the City of Colton. The Project site consists of an existing City-owned parcel (well site) and public street rights-of-way (pipeline alignment). The project is anticipated to include the following activities: site clearing and fencing, drilling, casing, developing, and testing of the wells using air-lift equipment and temporary diesel-driven pumps; installing pumping units, motors, electrical switchgear, and electrical power service; installing site piping, valves and appurtenances; installing an 8" to 12" diameter discharge pipeline in Fogg St. from the well site northerly to the City's existing 12" diameter waterline within M St.; installing an 8" to 12" diameter discharge pipeline in Congress St. from the well site westerly to the City's existing 16" diameter waterline within the 8th St.; installing disinfection facilities; painting aboveground facilities; constructing enclosures for protection of aboveground facilities; disinfecting the wells; plant start-up and operating the wells and well pumping plants.

Contact Information

Name
Eric Fraser
Agency Name
City of Colton
Contact Types
Lead/Public Agency

Location

Cities
Colton
Counties
San Bernardino
Cross Streets
Fogg St., Congress St.
Zip
92324
Total Acres
2.5
Parcel #
0613-232-01
State Highways
I-215, I-10
Railways
UPRR
Schools
Numerous
Waterways
Santa Ana River
Township
1S
Range
4W
Section
29
Base
SBB&M

Notice of Determination

Approving Agency
City of Colton
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes