John Glenn High School Improvement Project

2 Documents in Project

Summary

SCH Number
2007021016
Lead Agency
Norwalk-La Mirada Unified School District
Document Title
John Glenn High School Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
3/30/2007
Present Land Use
School / Public-Institutional / Public-Institutional
Document Description
The proposed project consists of the expansion of the administration building by 1,892 square feet (sf), renovation of the existing library/media center, and the construction of one new classroom building. The administration building would be expanded on the west side, and would displace portions of existing planters, two small trees, portions of existing brick walls and concrete walkway, grass, and will require the relocation of a flagpole. The new classroom facility would be a two-story, 17,312 sf building with a maximum height of 30 feet. Seven new student classrooms and five new science classrooms would be constructed. This building would be constructed east of the other new buildings between a row of classrooms and the athletic field and would displace several trees and a grass turf area.

Contact Information

Name
Myra Lopez
Agency Name
Norwalk-La Mirada Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Norwalk
Counties
Los Angeles
Cross Streets
Rosecrans Avenue / Imperial Highway
Zip
90650
Parcel #
8059-001-900
State Highways
I-5, I-105, SR-91
Railways
BNSF
Schools
Several
Waterways
San Gabriel River
Base
Whittier

Notice of Determination

Approving Agency
Norwalk-La Mirada Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print