Officers and Guards Building Renovation at Folsom State Prison

Summary

SCH Number
2007018147
Public Agency
California Department of Corrections and Rehabilitation (CDCR)
Document Title
Officers and Guards Building Renovation at Folsom State Prison
Document Type
NOE - Notice of Exemption
Received
Posted
1/22/2007
Document Description
The proposed project would renovate the Officers and Guards Building for usable office space. DGS previously completed a seismic retrofit project on the entire building. To complete the renovation, the remaining work would include the following: repair and seal exterior walls, repair and replace exterior cornice at the roof eave, repair and replace baseboards, trim and molding; repair and refinish existing windows and doors when possible and when necessary, remove and install new windows and doors; renovate existing interior stairs; install new walls around HVAC units, stairwells and offices; install new fire sprinkles and alarms; install new condenser unit for air conditioning; complete electrical and mechanical systems; and make access ADA compliant.

Contact Information

Name
Cher Daniels
Agency Name
California Department of Corrections and Rehabilitation
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Other Location Info
300 Prison Road, Represa

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15301(a)(d)
Reasons for Exemption
This project consists of repairs and minor alterations of an existing public structure involving negligible or no expansion of use (CEQA Guidelines 15301). This is one of a class of projects the Secretary for Resources has found do not have a significant effect on the environment, and therefore is declared to be categorically exempt from the requirement for preparing an environmental document. CDCR consulted with the Office of Historic Preparation (OHP) and obtained formal concurrence from the State Historic Preservation Officer (12/26/06) that the project will not result in a substantial adverse change to the Officers and Guards Building. CDCR will continue to coordinate with OHP as the plans and specifications are further developed and refined. Construction specifications will include exclusion and work windows to avoid impacts to protected bird species.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print