Santa Fe Springs Townlots Projects
4 Documents in Project
Summary
SCH Number
2005011096
Lead Agency
City of Santa Fe Springs
Document Title
Santa Fe Springs Townlots Projects
Document Type
NOD - Notice of Determination
Received
Posted
10/19/2006
Present Land Use
Zoning: M-2, Heavy Manufacturing
GP: Designation: Industrial
Document Description
DTSC has approved an Interim Removal Action Workplan (IRAW) that authorizes the excavation and off-site removal of approximately 10,000 cubic yards of contaminated soil located within the top 20 feet beneath, and adjacent to, the Former Beaumon Trust Property. These remedial activities would clear the pathway for the sampling of the deeper soils and a full evaluation to determine the extent of contamination and any further remediation that may be required. A site-specific Human Health Screening Evaluation will be performed using the most current California risk assessment guidance to ensure that residual chemical compounds in soil are safe and acceptable for future residents. Preparation and approval of the IRAW by DTSC is pursuant to Chapter 6.8 of the California Health and Safety Code.
Contact Information
Name
Michel Iskarous
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Cities
Santa Fe Springs
Counties
Los Angeles
Cross Streets
Telegraph Road and Norwalk Boulevard
Zip
90670
Total Acres
54.5
State Highways
I-5 and I-605
Railways
Santa Fe/Southern Pacific
Waterways
San Gabriel River
Notice of Determination
Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.