Laguna Canyon Dam and Reservoir Removal
2 Documents in Project
Summary
SCH Number
2004121090
Lead Agency
City of Irvine
Document Title
Laguna Canyon Dam and Reservoir Removal
Document Type
NOD - Notice of Determination
Received
Posted
7/25/2005
Present Land Use
The reservoir site is designated as Conservation Open Space - Water Bodies and it is zoned 1.6: Water Bodies.
Document Description
The proposed project would involve the removal of the Laguna Canyon Dam and Reservoir which are no longer required for agricultural purposes. An open channel drainage would be re-established to allow continued conveyance of storm water flow through the project site from the southern end of the reservoir north an existing drainage culvert at SR-133. The earth material excavated from the dam and reservoir would be placed in temporary stockpiles in the northern portion of the project site. The project would not involve development of any structures or uses that would involve human occupation.
Contact Information
Name
David A. Gutierrez
Agency Name
Department of Water Resources
Contact Types
Lead/Public Agency
Phone
Location
Cities
Irvine
Counties
Orange
Cross Streets
SE of I-405 / SR 133 Interchange
Total Acres
22
Jobs
10
Parcel #
588-011-09, 20
State Highways
I-405, SR 133
Other Information
Jobs: 10-15
Notice of Determination
Approving Agency
DWR - Division of Safety of Dams
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes