Addendum No. 5 to the Fianl

9 Documents in Project

Summary

SCH Number
2004071097
Lead Agency
Metropolitan Water District of Southern California
Document Title
Addendum No. 5 to the Fianl
Document Type
NOD - Notice of Determination
Received
Posted
4/12/2011
Document Description
The project modifications to the previously proposed sub-transmission line route associated with the Weymouth treatment plant 66-kV substation project is to: 1) install two new 90-foot steel riser poles, and three new 60-foot wood poles with two of the three wood poles having guy wires; 2) replace two wood poles, and remove an existing combination wood pole/guy wire/street light pole and replace with a concrete street light pole; 3) change the sub-transmission line route from along Bonita Avenue to 3rd Street, and install an additional sub-transmission vault (an increase of one vault over the previously stated three vaults); 4) increase the sub-transmission line route (an increase of 300 feet over the previously stated 4,200 feet); and 5) increase the overhead distribution line route (an increase of 500 feet over the previously stated 400 feet).

Contact Information

Name
Marty Meisler
Agency Name
The Metropolitan Water District of Southern CA
Contact Types
Lead/Public Agency

Location

Cities
La Verne
Counties
Los Angeles
Cross Streets
Wheeler Avenue / Holly Oak Street
Zip
91750
Total Acres
135
State Highways
30, I-210
Railways
SCRRA, BNSF
Airports
Brackett Field
Schools
Damien HS, Ramona JHS, Calvary
Waterways
Wheeler Creek
Township
1S
Range
9W
Section
1
Base
SB

Notice of Determination

Approving Agency
The Metropolitan Water District of Southern CA
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print